Section 29 Fuse Side Skins

Back to home page
Page 29-15 thru 29-17

Step 1: Dimple the holes in the F-1001A Firewall Bulkhead

 F-1002-L and -R Fwd Fuselage Bulkheads

F-1088-L and -R Fwd Fuselage Ribs that are common to the F-1069-L and-R Fwd Side Skins.

Dimple the single hole in the forward and aft tab of the F-1088 Fwd Fuselage Ribs, and the underlying hole in the flanges of the fwd fuselage bulkheads and F-1042-L and - R Bulkhead Side Channel.

Dimple the holes in the F-1015B Foot Well Intercostals,

 F-1015F Spacers,

F-1034C Fuselage Bulkheads,

F-1023 Baggage Floor Angles

F-10100A and F-10101 Baggage Door Shims ( note the shims orientation and the holes not to be dimpled on Page 29-8, Figure 2) holes that are common to the F-1070 Mid Side Skins.

Step 2: Using callout in Figure 1 dimple the F-1069 Fwd Side Skin and the F-1070 Mid Side Skin.

Step 3:  Remove the hatched area from the baggage door area on the F-1070-L Mid Skin as shown in Figure 1.

 

Step 4: Enlarge the wing wire run location in the F-1070-L and - R Mid Side Skins.

Step 5: Check that all parts worked with in this section have been deburred. Prime the F-1013-L and-R Fwd Fuse Longerons and the F-1046-L and-R Mid Fuse Longerons. Prime the remaining parts if desired.

Page 29-16

Step 1:  Modify the empennage bucking bar created on Page 9-12, Step 3 for use in the rest of the section. See Figure 1.

 

Step 2: Rivet the F-1034-B Seat Back Brace to the F-1034C-L and-R Fuselage Bulkheads per the callouts on Page 29-7, Figure 1.

 Rivet the Seat Back Brace Gusset, F-1046-L Mid Fuse Longeron and F-1002B Baggage Door Seal Angle together per the callout on Page 29-6, Figure 2. Rivet the F-10102A Baggage Door Seal Angle to the mid fuse Longeron per the callouts on Page 29-6, Figure 2.

 

Rivet the seat back brace and seat back gusset to the F-1046-R Mid Fuse Longeron together per the callouts on Page 29-7, Figure 2.

 

Step 3:Rivet the F-1046-L Mid Fuse Longeron to the F-1005E-L Gusset, Rivet the F-1046-R Mid Fuse Longeron to the F-1005E-R Gusset. Rivet callouts are on Page 29-7, Figure 1.

Step 4: Cleco the F-1002 Fwd Fuse Bulkheads, F-1040 Upper Fuse Channels, F-1041 Lwr Fuse Channels and F-1042E Gussets together and to the understructure.

Step 5: Rivet the upper flange of the F-1040 Upper Fuse Channels to the F-1001B Firewall Upper Angle and WD-1002 Upper Firewall Brackets.

Rivet the lower flange of the upper fuse channels to the upper firewall brackets.

Rivet both the upper and lower flanges of the F-1041 Lwr Fuse Channel Lwr Fuse Channels to the WD-1003 Lower Firewall Brackets. Rivet callouts are on Page 29-12, Figure 2.

Step 6:  Slip the F-1013 Fwd Fuse Longerons in place, then cleco them to the F-1001-J Longeron Gussets. Rivet the forward fuselage longerons to the Longeron gussets. See Page 29-12, Figure 2.

Step 7:  Rivet the F-1042-E Gussets to the F-1042 Bulkhead Side Channels and F-1040 Upper Fuse Channels per the callouts on Page 29-12, Figure 2.

Step 8:  Rivet the lower tab on the F-1002 Fwd Fuselage Bulkheads to the upper flange of the F-1041 Lower Fuse Channel. Rivet callouts are on Page 29-12, Figure 2.

Step 9:  Rivet the 1023-L Baggage Floor Angle and the F-10100A and 10101 Baggage Door Shims to the F-1070-L Mid Side Skin per the rivet callouts on Page 29-8 Figure 2 (do not rivet the seven aft most holes marked do not rivet). Rivet the F-1023-R Baggage Floor Angle to the F-1070 Mid Side Skin per the callouts on page 29-8, Figure 3. Back riveting on a plate work well.

Step 10: Cleco the F-1069-L and - R Fwd Side Skins, F-1042B and C Clips, F-1015F Spacers, F-1070 Mid Side Skins to the fuselage assembly understructure. Check that the forward and mid side skins butt against one another properly

Page 29-17

Step 1: Start by riveting the double row of rivets on either side of the joint between the F-1069 Forward Side Skins and the F-1070 Mid Skin Skins. Rivet callouts are in Figure 1, Figure 2 and Page 29-18, Figure 1.

Rivet the F-1070-R Mid Side Skins to the fuselage assembly understructure using the callouts in Figure 1 and Figure 2 (only rivet the locations that have callouts)

Step 2:Cleco the F-1015C Mid Cabin Decks to the understructure.

Step 3:  Rivet the mid cabin decks to the F-1005C Bulkhead Side Channels per the callouts on Page 29-7 Figure 1.

Rivet the mid cabin decks to the F-1015B Foot Well Rib Intercostals per the callouts on Page 29-7, Figure 1.

Rivet the mid cabin decks to the F-1042 Bulkhead Side Channels per he rivet callouts on Page 29-12

, Figure 2. Rivet the mid cabin decks to the F-1013 Fwd Fuse Longerons per the callouts on Page 29-7, Figure 1.

Page 29-18

Step 1: Rivet the three AN426AD3-5 rivets below the MS21051-L3 nutplate, see Figure 1. Rivet the two nutplates called out in Figure 1 to the fuselage assembly understructure and to the F-1069-L and -R Fwd Side Skins.

Step 2: Rivet the F-1069-L and -R Fwd Side Skins to the fuselage understructure per the callouts in Figure 1. Begin riveting at the bottom and work upwards.

 

On to Next Page