|
MIKE
HOWE'S RV7 FUEL TANKS
PAGE 2
page 1
page 3 Back
to directory
|
|
April 2, 2002
Remove the vinyl
from the inside of the tank skin and cleco the skin to the ribs,
baffle and spar
|
|

|
Cleco
tank skin to ribs, baffle, spar
|
|
Match Drill the T-701 to W-423 |
|
Match Drill the T-701 to W-423
|


|
|
Remove the clecoed tank assembly
from the wing, and drill all river holes to final size (Doing so
off the wing prevents accidentally drilling into the spar). |
|


|
Tank
in cradle for drilling |
|
April
7, 2002
|
|
|
|
|
|
|
|
|
Disassemble the tank, marking all
parts so they may be easily returned to the same location |
|
|
|
|
Fabricate the T-406. You need to
look at the next drawing because it says on side contour needs to
fit the rib tip , so the left and right one will be different. I
drew a template from another builders part and it worked very
well. I am going to try to figure out a way to put a template you
can download and print it out , cut it out and use it. |
|
|

|
|
The 406 test fit into the end of the
rib. |

|
Test
Fit the T-406 in the rib end. |
|
Put the T-406 & T -410
reinforcing plates in place on the end ribs and drill the attach
holes.
|
|
Drill Attach &
Reinforcement plate
|

|
|
page 1
page 3 Back
to directory
|
|
|
|
|
|
|